Flooding and erosion during storms already affect the City’s wastewater and water infrastructure. These impacts are expected to become more frequent and more severe in the coming decades due to climate changes including rising sea levels and heavier rainfall during storms. 

The City developed the Wastewater and Water Systems Climate Adaptation Plan to evaluate current and future impacts on the City's water and wastewater systems and outline a phased approach for adapting these systems over time. 

Adopted by City Council on April 14, 2026, the Plan is part of the City's Adaptation and Resilience Program, which monitors changing conditions and adapts infrastructure in phases. The project was jointly funded by the California Coastal Commission, the California Coastal Conservancy, and the City of Santa Barbara.

Largest Risks

The Plan analyzes the impacts on all parts of the City's wastewater and water systems related to flooding, erosion, sea level rise, changing rainfall, wildfire, drought, extreme heat, and rising groundwater levels. The Plan identifies increased flooding of the wastewater system as the highest priority risk to City infrastructure, particularly in low-lying areas from the Waterfront to just north of Highway 101. 

During storms, floodwaters can overwhelm the sewer collection system, leading to sanitary sewer overflows. Access roads to the El Estero Water Resource Center currently flood during high rainfall events, and these conditions are expected to worsen with increased rainfall rates and sea level rise. In the coming decades, rising sea levels and coastal storm surges also threaten to introduce saltwater into the wastewater collection system. Because the Center’s sewage treatment process depends on bacteria that are intolerant to seawater, any saltwater flooding of the system causes significant disruptions in operations.

Widgets

Priority Adaptation Actions

The Plan identifies the following high-priority adaptation measures for implementation over the next 25 years: 

  • Upgrade the wastewater collection system: Seal sewer manholes, rehabilitate flood-prone sewer lines, and increase storage to handle flooding and prevent saltwater intrusion. Plan to pressurize sewer systems in low-lying areas over the next 25 to 50 years. 
  • Protect El Estero Water Resource Center: Develop a formal operations plan to ensure the facility’s safe operations during flooding events. Add flood protection such as floodwalls and elevated infrastructure.  
  • Protect or relocate coastal infrastructure: Plan to protect or relocate infrastructure threatened by shoreline erosion, including utilities under Cabrillo Boulevard and portions of the Charles E. Meyer Desalination Plant intake infrastructure. 
  • Reduce stormwater flooding: Develop comprehensive stormwater flooding models for various rainfall intensities and identify strategies to enhance the capacity of stormwater infrastructure and reduce flooding. 