The purpose of this project is to create a practical plan that prepares the Santa Barbara Waterfront for increased storm surges, erosion, and flooding by providing solutions that preserve and enhance recreation, commerce, beach access, habitat, and critical infrastructure for the near term and future generations

The Waterfront is already at risk of flooding, storm surge, and erosion during coastal storm that will become exacerbated with even small amounts of sea-level rise. Some of the adaptation measures the plan will consider are raising or modifying the Harbor breakwater and groins, flood protection measures for the Harbor Commercial area, and realignment of portions of the beach multiuse path.

Widgets

Timeline

1
Kickoff

September 2024

2
Technical Modeling and Vulnerability Assessment

November 2024 - July 2025

3
Adaptation Alternatives Analysis and Recommendation

August 2025 - February 2026

4
Public Draft Plan Development

March 2026 - July 2026

5
Public Comment Period

August 2026 - September 2026

6
Plan Revisions

October 2026 - November 2026

7
Final Plan Adoption

December 2026