All SBPL locations will be closed on Monday, September 1 for Labor Day.

15236

We are working on economic and public safety response time analysis. Our next City Council meeting on the State Street Master Plan is anticipated in September 2025. 

14531
Image

The City is not starting from scratch on its quest for carbon neutrality. Many programs and projects are being implemented right now that set the Santa Barbara community up for success. On this page you can find information on our solar, solar and battery, green building, vehicle electrification projects, and other projects bringing our community Together to Zero. 

Current and Upcoming Projects

Entrance sign at Parking Lot 12 in Downtown Santa Barbara with businesses in the background
In May 2025 the Clean Community Division completed a remediation project at Parking Lot 12 in downtown Santa Barbara. Prior to becoming a City parking lot, the site's historic uses left lasting underground pollutants. The project…
Mission Creek Fish Passage
The endangered Southern California steelhead trout is native to Santa Barbara’s coastal streams, including Mission Creek. Steelhead are born in freshwater streams/rivers, where they typically spend their first year, then migrate to the…
Mission Creek at Oak Park
In 2022, the Creeks Division began initial design work on the Mission Creek Restoration at Oak Park. The project included transforming an 1,800 foot reach of Mission Creek that flows through the City's…
Rock crossing of Old Mission Creek at Bohnett Park
In 2003, the Creeks Division completed a restoration project along Old Mission Creek at Bohnett Park. The project included the construction of stairs and two creek crossings to improve access to the park. Creek banks were reconstructed to…
Tesla and Dirt Road electric vehicle chargers at the Ortega Garage in Santa Barbara.
This project installed Level 2 EV fast chargers at the Ortega Parking Garage, bringing EV charging to residents, downtown works, and visitors.
Permeable Pavers
The Creeks Division has installed permeable pavers in City-owned parking lots, sidewalks, streets, alleys, and parks in several locations, in order to allow storm water and urban runoff to infiltrate into the ground.
Close up of electric vehicle charger and people walking into a home in the background with Santa Barbara Clean Energy logo
Santa Barbara Clean Energy's Residential EV Program is designed to make switching to electric transportation easier and
Harbor Way Flooding
In 2021 the City adopted it’s first Sea Level Rise Adaptation Plan that identifies areas of the
Environmental Canine Services staff and dogs Sable and Logan investigate storm drains
In 2010 the Creeks Division received grant funding from the Water Environment Research Foundation for the Canine and Microbial Source Tracking Project. The Canine and Microbial Source Tracking Project built on efforts to identify and…
Heavy equipment in street installing Haley Street CDS (continuous deflection system) unit
Constructed in 2006, the purpose of these two storm drain diversions was to improve summer water quality in creeks and beaches in the City of Santa Barbara. The projects diverted dry weather flow (urban runoff) at the Hope…
Storm drain screen on a City street
In 2011, the Creeks Division  installed storm drain screens in nearly all of the storm drain openings in the City (approximately 1400 inlets).  The retractable screens keep trash from entering the storm drains, which lead to the…
rain garden
The Creeks Division's Sustainable Storm Water Rebate Program provides incentives to residents and businesses to help offset the cost of installing storm water capture devices. Rebates are offered for rain barrels, rain gardens,…
Barger Canyon Preserve along upper Arroyo Burro
In late 2013, the Creeks Division purchased a 14.19-acre parcel on Foothill Road along Upper Arroyo Burro in Barger Canyon. The parcel was an environmentally sensitive and degraded site with approximately 1,800 linear feet of creek…
Upper Las Positas Creek.JPG
The Upper Las Positas Creek Restoration Project, completed in 2010, included the restoration of approximately eight acres of wetland habitat and an engineered storm water management system at the Santa Barbara Golf Club and Adams…
Wastewater and Water Systems Climate Adaptation Plan Cover Hero Image
This plan will evaluate vulnerabilities of the City’s wastewater and water infrastructure from sea level rise, changes in rainfall patterns, and rising groundwater levels. It will identify alternatives for relocating, flood-proofing, and/…

Completed Projects

Entrance sign at Parking Lot 12 in Downtown Santa Barbara with businesses in the background
In May 2025 the Clean Community Division completed a remediation project at Parking Lot 12 in downtown Santa Barbara. Prior to becoming a City parking lot, the site's historic uses left lasting underground pollutants. The project…
Mission Creek Fish Passage
The endangered Southern California steelhead trout is native to Santa Barbara’s coastal streams, including Mission Creek. Steelhead are born in freshwater streams/rivers, where they typically spend their first year, then migrate to the…
Mission Creek at Oak Park
In 2022, the Creeks Division began initial design work on the Mission Creek Restoration at Oak Park. The project included transforming an 1,800 foot reach of Mission Creek that flows through the City's…
Rock crossing of Old Mission Creek at Bohnett Park
In 2003, the Creeks Division completed a restoration project along Old Mission Creek at Bohnett Park. The project included the construction of stairs and two creek crossings to improve access to the park. Creek banks were reconstructed to…
Tesla and Dirt Road electric vehicle chargers at the Ortega Garage in Santa Barbara.
This project installed Level 2 EV fast chargers at the Ortega Parking Garage, bringing EV charging to residents, downtown works, and visitors.
Permeable Pavers
The Creeks Division has installed permeable pavers in City-owned parking lots, sidewalks, streets, alleys, and parks in several locations, in order to allow storm water and urban runoff to infiltrate into the ground.
Close up of electric vehicle charger and people walking into a home in the background with Santa Barbara Clean Energy logo
Santa Barbara Clean Energy's Residential EV Program is designed to make switching to electric transportation easier and
Harbor Way Flooding
In 2021 the City adopted it’s first Sea Level Rise Adaptation Plan that identifies areas of the
Environmental Canine Services staff and dogs Sable and Logan investigate storm drains
In 2010 the Creeks Division received grant funding from the Water Environment Research Foundation for the Canine and Microbial Source Tracking Project. The Canine and Microbial Source Tracking Project built on efforts to identify and…
Heavy equipment in street installing Haley Street CDS (continuous deflection system) unit
Constructed in 2006, the purpose of these two storm drain diversions was to improve summer water quality in creeks and beaches in the City of Santa Barbara. The projects diverted dry weather flow (urban runoff) at the Hope…
Storm drain screen on a City street
In 2011, the Creeks Division  installed storm drain screens in nearly all of the storm drain openings in the City (approximately 1400 inlets).  The retractable screens keep trash from entering the storm drains, which lead to the…
rain garden
The Creeks Division's Sustainable Storm Water Rebate Program provides incentives to residents and businesses to help offset the cost of installing storm water capture devices. Rebates are offered for rain barrels, rain gardens,…
Barger Canyon Preserve along upper Arroyo Burro
In late 2013, the Creeks Division purchased a 14.19-acre parcel on Foothill Road along Upper Arroyo Burro in Barger Canyon. The parcel was an environmentally sensitive and degraded site with approximately 1,800 linear feet of creek…
Upper Las Positas Creek.JPG
The Upper Las Positas Creek Restoration Project, completed in 2010, included the restoration of approximately eight acres of wetland habitat and an engineered storm water management system at the Santa Barbara Golf Club and Adams…
Wastewater and Water Systems Climate Adaptation Plan Cover Hero Image
This plan will evaluate vulnerabilities of the City’s wastewater and water infrastructure from sea level rise, changes in rainfall patterns, and rising groundwater levels. It will identify alternatives for relocating, flood-proofing, and/…